We have successfully completed the ground-mounted solar power plant with a total installed capacity of 854 kWp for our investor ÇAĞLACAN İNŞAAT TURİZM ENERJİ HAY.İTH.İHR.SAN.TİC.VE PAZ.LTD.ŞTİ., located in Kuşadası , Aydın. The project was carried out with the dedicated efforts of our expert engineers and field team.
All processes were meticulously managed in line with the highest occupational safety standards and superior workmanship quality. Following the official inspections, our professional execution was approved, and the plant was successfully commissioned.
With this project, Yaylaköy now meets its energy demand from clean and renewable sources, optimizing energy costs while making a significant contribution to its environmental sustainability goals.
Investor ÇAĞLACAN İNŞAAT TURİZM ENERJİ HAY.İTH.İHR.SAN.TİC.VE PAZ.LTD.ŞTİ.
Location Kuşadası – Aydın/TÜRKİYE
Installed Power 854 kWp / 650 kWe
Solar Panel 2800 Adet 305 Wp 2H Güneş Paneli
Acceptance Date 15.11.2019